Client Overview

Foster Refrigerator operates a major manufacturing facility in King’s Lynn, producing high-quality commercial refrigeration equipment. The site includes a large industrial roof structure with internal box guttering systems designed to manage rainwater runoff.

Roof Drainage Pumping Solutions
Roof Drainage Pumping Solutions
Roof Drainage Pumping Solutions
Roof Drainage Pumping Solutions
The Challenge

The facility’s internal box guttering presented a recurring operational risk:

Roof Drainage Pumping Solution overflow risk environmental blockages pumping solutions

Environmental Blockages

The site is heavily populated by seagulls, leading to frequent accumulation of feathers, nesting debris, and waste within the gutter system.

Roof Drainage Pumping Solution overflow risk during heavy rainfall pumping solutions

Overflow Risk During Heavy Rainfall

During periods of intense rainfall, the system could not cope with the volume of water

Roof Drainage Pumping Solution restricted flow capacity pumping solutions

Restricted Flow Capacity

Build-up of debris reduced the effectiveness of gravity drainage

Roof Drainage Pumping Solution production impact pumping solutions

Production Impact

Overflow events resulted in water ingress into the production area, causing:

  • Damage to materials and finished products
  • Costly downtime and clean-up operations
Roof Drainage Pumping Solution overflow risk environmental blockages pumping solutions

Environmental Blockages

The site is heavily populated by seagulls, leading to frequent accumulation of feathers, nesting debris, and waste within the gutter system.

Roof Drainage Pumping Solution overflow risk during heavy rainfall pumping solutions

Overflow Risk During Heavy Rainfall

During periods of intense rainfall, the system could not cope with the volume of water

Roof Drainage Pumping Solution restricted flow capacity pumping solutions

Restricted Flow Capacity

Build-up of debris reduced the effectiveness of gravity drainage

Roof Drainage Pumping Solution production impact pumping solutions

Production Impact

Overflow events resulted in water ingress into the production area, causing:

  • Damage to materials and finished products
  • Costly downtime and clean-up operations
The Solution

A robust pumping solution was designed to support and protect the existing drainage system during peak rainfall events.

Key elements of the solution included:

Implementation

The installation was carried out with minimal disruption to operations:

Careful integration with existing guttering infrastructure
Strategic pump placement to maximise efficiency
Commissioning and testing under simulated high-flow conditions
Results & Benefits

Elimination of Overflow Incidents

Since installation, there have been no recorded cases of gutter overflow entering the production area.

Protection of Production Assets

Finished products and materials are no longer at risk from water ingress.

Reduced Downtime

The site has avoided costly interruptions previously caused by flooding.

Improved System Resilience

The combined gravity and pumped solution now handles both normal and extreme weather conditions effectively.

Conclusion

By implementing a targeted pumping solution using air-operated diaphragm pumps, Foster Refrigerator significantly improved the resilience of its roof drainage system. The project successfully eliminated a longstanding risk, delivering ongoing operational reliability and cost savings.